After completing a facility masterplan with MHM, the Knoxville Utilities Board (KUB) realized that to best utilize their existing building stock and meet their future needs - expansion was required. Always determined to best use member funding, the project team thought creatively about how to achieve needs and workflow without over building.
Rather than constructing a brand-new Engineering and Operations Building, it was determined that the Electric, Natural Gas, Water/Wastewater Engineering and Field Services groups could move into a 50,000 sf addition to the existing building while allowing the Information Services and Operations groups to expand in a renovated facility. The new building was designed to complement the existing material rhythm and connect by an open, light-filled staircase with their respective breakrooms overlooking it.